Nekochan Net

Official Chat Channel: #nekochan // irc.nekochan.net
It is currently Thu Apr 24, 2014 9:06 pm

All times are UTC - 8 hours


Forum rules


Please post your 'hinv' in the following format:

Topic: Kind of machine (O2, Octane, Tezro, Onyx2, etc.), CPU (R10k 250MHz, R12k 300MHz, R16k 1GHz, etc.), RAM, graphics option (Example: Tezro V12 4xR16K 700MHz 4GB)

Body: output of hinv -v (hinv -vm if possible) and /usr/gfx/gfxinfo.

Please wrap the output in BBCode "code" blocks to improve legibility.



Post new topic Reply to topic  [ 3 posts ] 
Author Message
Unread postPosted: Wed Dec 22, 2010 8:40 pm 
Offline
User avatar

Joined: Mon Nov 12, 2007 7:54 pm
Posts: 1185
Location: Berkeley, CA, USA, NA, Earth, Sol
Thanks to Mike for a great packing job on this one.

Nice Indigo2 with IMPACT badge and matching feet. I've got a 100aseT 3COM EISA card around here that I'll install once I find it again... And at some point it'll get a fresh install.

Edit: Halfway to a GigaRAM Indigo2 with one kit of HP D4893A 128MB SIMMs installed and another set on order. Why? Why not?? Also added the "10000" badge. I'll have to see what happened to the pictures I took...

Code:
# hinv -vm
FPU: MIPS R10010 Floating Point Chip Revision: 0.0
CPU: MIPS R10000 Processor Chip Revision: 2.5
1 195 MHZ IP28 Processor
Main memory size: 768 Mbytes
Secondary unified instruction/data cache size: 1 Mbyte
Instruction cache size: 32 Kbytes
Data cache size: 32 Kbytes
Integral SCSI controller 0: Version WD33C93B, revision D
  Disk drive: unit 1 on SCSI controller 0 (unit 1)
  Disk drive: unit 2 on SCSI controller 0 (unit 2)
  CDROM: unit 3 on SCSI controller 0
Integral SCSI controller 1: Version WD33C93B, revision D
On-board serial ports: 2
On-board bi-directional parallel port
Graphics board: Solid Impact
Integral Ethernet: ec0, version 1
Iris Audio Processor: version A2 revision 1.1.0
EISA bus: adapter 0
#

Code:
# /usr/gfx/gfxinfo -vv
Graphics board 0 is "IMPACTPC" graphics.
        Managed (":0.0") 1280x1024
        Product ID 0x1, 1 GE, 1 RE, 0 TRAMs
        MGRAS revision 1, RA revision 0
        HQ rev A, GE11 rev B, RE4 rev A, PP1 rev A,
        VC3 rev A, CMAP rev EMC rev D
        unknown, assuming 19" monitor (id 0xf)

        Input Sync: Voltage - Video Level; Source - Internal; Genlocked - False
        Channel 0:
         Origin = (0,0)
         Video Output: 1280 pixels, 1024 lines, 60.00Hz (1280x1024_60)
         Video Format Flags:  (none)
         Sync Disabled
         Using Gamma Map 0
         Monitor Type:  unknown
#

Code:
# uname -aR
IRIX64 PURPSY 6.5 6.5.21f 07141608 IP28
#

Code:
# scsicontrol -i /dev/scsi/*
/dev/scsi/sc0d1l0:  Disk          IBM     DGHS09Z         03E0
ANSI vers 3, ISO ver: 0, ECMA ver: 0; supports:  synch linkedcmds cmdqueing
Device is  ready
/dev/scsi/sc0d2l0:  Disk          SEAGATE ST15230N        0638
ANSI vers 2, ISO ver: 0, ECMA ver: 0; supports:  synch cmdqueing
Device is  ready
/dev/scsi/sc0d3l0:  CD-ROM        TOSHIBA CD-ROM XM-5401TA0436
ANSI vers 2, ISO ver: 0, ECMA ver: 0; supports:  reladdr linkedcmds
Device is  not ready
#

Code:
# /sbin/diskpatch -v
sc0d1l0:  Disk         IBM     DGHS09Z         03E0  Serial: 6827A323
sc0d2l0:  Disk         SEAGATE ST15230N        0638  Serial: 00536493
#

_________________
Then? :IRIS3130: ... Now? :O3x02L: :A3504L:- :A3502L: :1600SW:+MLA :Fuel: :Octane2: :Octane: :Indigo2IMP: ... Other: DEC :BA213: :BA123: Sun, DG AViiON, NeXT :Cube:


Last edited by smj on Thu Aug 11, 2011 1:40 pm, edited 1 time in total.

Top
 Profile  
 
Unread postPosted: Wed Dec 22, 2010 8:53 pm 
Offline
User avatar

Joined: Sun Mar 01, 2009 9:53 am
Posts: 460
Location: Louisville, KY
Very Nice! Pics?

_________________
:Octane2: :Octane2: :Octane: :Indigo2IMP: :Indigo2: :O2: :O2+:

Octane2 2x600 V12 8GB
- Octane2 600 V12 2GB - Octane 2x400 V10 2GB
Indigo² 195 Max Impact 386MB - Indigo² 250 Extreme 386MB
O2 350 CRM 256MB - O2+ 400 CRM 512MB

"I'm totally unappreciated in my time. You can run this whole park from this room, with minimal staff, for up to three days. You think that kind of automation is easy? Or cheap? You know anybody who can network eight Connection Machines and de-bug two million lines of code for what I bid this job? Because if you can, I'd love to see him try."


Top
 Profile  
 
Unread postPosted: Wed Dec 22, 2010 10:21 pm 
Offline
User avatar

Joined: Mon Nov 12, 2007 7:54 pm
Posts: 1185
Location: Berkeley, CA, USA, NA, Earth, Sol
Pics tomorrow, I'll edit this placeholder and add them.

_________________
Then? :IRIS3130: ... Now? :O3x02L: :A3504L:- :A3502L: :1600SW:+MLA :Fuel: :Octane2: :Octane: :Indigo2IMP: ... Other: DEC :BA213: :BA123: Sun, DG AViiON, NeXT :Cube:


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC - 8 hours


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group